{"id":1602,"date":"2026-04-13T18:09:04","date_gmt":"2026-04-13T18:09:04","guid":{"rendered":"https:\/\/avcnoticias.com\/?p=1602"},"modified":"2026-10-04T16:26:09","modified_gmt":"2026-10-04T16:26:09","slug":"%f0%9f%9a%a7-reabren-calle-neptuno-en-tiempo-y-sin-afectar-regreso-a-clases","status":"publish","type":"post","link":"https:\/\/avcnoticias.com\/?p=1602","title":{"rendered":"Reabren calle Neptuno en tiempo y sin afectar regreso a clases"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">La Junta Municipal de Agua y Saneamiento de Ju\u00e1rez reabri\u00f3 en tiempo y forma la calle Neptuno, tras concluir un operativo de reposici\u00f3n de tuber\u00eda sanitaria en las colonias Sat\u00e9lite I y II. Gracias a la planeaci\u00f3n de las obras, el regreso a clases de este lunes se llev\u00f3 a cabo sin complicaciones viales, al dejar habilitada la vialidad desde el fin de semana.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Durante la intervenci\u00f3n se instalaron 105 metros de l\u00ednea de drenaje y 14 descargas sanitarias en un tramo ubicado frente a una escuela primaria. De acuerdo con el ingeniero Omar Villegas, coordinador de residentes, los trabajos se realizaron en un periodo de dos semanas con el objetivo de garantizar la seguridad y la salud p\u00fablica, asegurando el correcto flujo del sistema sanitario. Adem\u00e1s, se efectuaron labores de limpieza y recarpeteo antes de la reapertura.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La dependencia inform\u00f3 que los trabajos continuar\u00e1n en calles secundarias del mismo sector, con la meta de concluir el proyecto total en noviembre. Asimismo, se contempla la instalaci\u00f3n de 200 metros adicionales de tuber\u00eda hacia la avenida G\u00f3mez Mor\u00edn en pr\u00f3ximas etapas, que se desarrollar\u00e1n durante periodos vacacionales. Con estas acciones, la JMAS reafirma su compromiso con el fortalecimiento de la infraestructura hidr\u00e1ulica en beneficio de la poblaci\u00f3n.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>La Junta Municipal de Agua y Saneamiento de Ju\u00e1rez reabri\u00f3 en tiempo y forma&hellip;<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_lmt_disableupdate":"","_lmt_disable":"","footnotes":""},"categories":[20],"tags":[1517,398,1173],"class_list":["post-1602","post","type-post","status-publish","format-standard","hentry","category-local","tag-calle-neptuno","tag-jmas-juarez","tag-obras-drenaje"],"_links":{"self":[{"href":"https:\/\/avcnoticias.com\/index.php?rest_route=\/wp\/v2\/posts\/1602","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/avcnoticias.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/avcnoticias.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/avcnoticias.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/avcnoticias.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1602"}],"version-history":[{"count":0,"href":"https:\/\/avcnoticias.com\/index.php?rest_route=\/wp\/v2\/posts\/1602\/revisions"}],"wp:attachment":[{"href":"https:\/\/avcnoticias.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1602"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/avcnoticias.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1602"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/avcnoticias.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1602"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}